Once District 8 construction has been completed could the Hathian Mass Transit Authority do a route study to see if there needs to be any changes in the stops and possibly a feasibility study to determine if a regional route to Port Laveau would be in the best interest to those needing to travel between the two municipalities?
Thanks!
|
Sign in at the very top to read this reply. ツ
|
Sign in at the very top to read this reply. ツ
|
Sign in at the very top to read this reply. ツ
|
Sign in at the very top to read this reply. ツ
|
Sign in at the very top to read this reply. ツ
|
Sign in at the very top to read this reply. ツ
|
Sign in at the very top to read this reply. ツ
|